Rendering displayed at the construction site.
Connected to Le Metropol in Montreal
3,648 × 2,736 px·2.02 MB·JPEG·375-807-029
- Format
- JPEG
- Dimensions
- 3,648 × 2,736 px
- File size
- 2,118,395 bytes
- Author line
- Florian Barbier
- Medium
- computer rendering
RatingJoin to rate
