Watching the process of a steel rebar cage being placed into in position within a caisson tube (C): workers guiding the cage into the caisson hole
Connected to Trump International Hotel & Tower in Chicago
2,560 × 1,920 px·2.11 MB·JPEG·495-458-986
- Format
- JPEG
- Dimensions
- 2,560 × 1,920 px
- File size
- 2,211,264 bytes
- Author line
- B. Victor Adams
- Medium
- photograph
RatingJoin to rate
