Construction staging on the south approach, with the West Bank Office Building
Connected to St. Anthony Falls Bridge in Minneapolis
3,048 × 2,286 px·4.06 MB·JPEG·712-503-688
- Format
- JPEG
- Dimensions
- 3,048 × 2,286 px
- File size
- 4,256,017 bytes
- Author line
- James Peacock
- Medium
- photograph
RatingJoin to rate
