facade installation begins
The first elements of a structure's outer facade surface are attached in their designed positions.
Facade installation on a structure begins when the first elements of its outer surface are attached where they belong according to the design. This normally occurs no sooner than the framework begins assembly, but in some cases an applied masonry facade may begin rising before the load-bearing framework behind it. This event can also occur after a structure's framework has been completed.
Facade materials must be attached to the structure in their intended places. Their delivery or storage on the site does not begin facade installation.
Rising above the base concerns the structure's first elements above its baseline. Facade work has its own start and can overlap frame assembly instead of waiting for the entire framework to be finished.
facade installation begins Photos
Related definitions
-
completion
A structure is basically finished on the outside, and at least partly ready for use. -
construction halted midway
Construction stops before completion for at least 10 days in an irregular interruption, excluding routine breaks. -
cornerstone laid
The date when a ceremonial or real stone is laid in or on the ground in celebration of the start of construction. -
excavation begins
Earth moving and removal begins in preparation for and in service of construction. -
facade installation complete
The final non-window section of the designed facade is installed, completing that part of the enclosure. -
facade painting begins
The first application of the original coat of paint to a built object's facade begins. -
facade painting ends
The last application of the original coat of paint to a large portion of a facade is finished. -
final-phase work resumes
Construction on a structure whose framework was already complete continues after having stopped. -
first tower crane assembled
The first tower crane used in the construction of a structure begins operations. -
first window installed
The first window on the surface of a structure is fixed in its designed place. -
foundation work begins
The first permanent physical element of a structure's foundation is put in place. -
foundation work resumes
Foundation work resumes at or below a structure's base after an irregular stoppage lasting at least 10 days. -
framework completed
The whole framework of a structure is assembled in place, and the structure has attained its general size and shape. -
framework resumes
Work on an unfinished structural frame resumes after an irregular stoppage lasting at least 10 days. -
groundbreaking ceremony
A celebratory event marking the recent, actual, or impending commencement of construction. -
horizontal addition begins construction
Continuous work starts on a new addition at the side of an existing structure. -
horizontal addition completed
A new extension to the side of an existing structure is finished and ready for use. -
last tower crane dismantling begins
The last tower crane used in the construction of a structure begins to be dismantled. -
last window installed
The last window separating a structure's interior from the outside is fixed in its designed position. -
maximum height reached
The highest element included in a structure's architectural height is fixed in its designed position. -
roof installation begins
The first roof materials, including its cladding or supporting understructure, are fixed during initial construction. -
roof installation ends
All materials of the original roof, including cladding, understructure, and insulation, have been fixed in place. -
site cleanup begins
A reasonably continuous phase of site clearance or excavation begins in preparation for initial foundation construction. -
structural core tops out
The structural core of a building's inner framework reaches its designed maximum height during construction. -
structure rises above base
The first elements of a structure are fixed in their places above its base level. -
vertical addition begins construction
Continuous construction starts on a significant addition resting on top of an existing built object. -
vertical addition completed
A significant addition resting on top of an existing built object is physically finished and ready for use.