observation area opens
The first general public access to a designated high observation area, whether free or admission-paid.
An observation area in a structure opens when the general public is first given access, whether for free or for money, to an area in or on the structure designated for viewing the surroundings from a high perspective. This area can include a floor, terrace, rooftop, balcony, room, or some combination of these.
The event occurs when the public first gains access, not merely when the viewing space is physically completed. Charging admission does not prevent an opening from qualifying.
The observation area can be indoors, outdoors, or a combination. A floor, room, terrace, rooftop, or balcony can provide the high viewpoint.
observation area opens Photos
Related definitions
-
consecration
The moment when a place officially receives a religious status as a sacred site. -
elevator inspection
An official review of a structure's elevators by the governmental authority responsible for code compliance. -
first tenants move in
The first regular occupants move in and begin using a structure, potentially before all construction is complete. -
first unit rented
The first unit rental for a structure occurs, whether before, during, or after construction. -
first unit sold
The first unit of a structure is sold, whether before, during, or after construction. -
full inspection by private contractor
A professional on-site review of an entire structure or site by an independent private third party. -
full inspection by public authority
A professional on-site review of an entire structure or construction site by a government representative. -
observation area closes permanently
A room or deck for high observation is closed to the public, without prospect for re-opening. -
occupancy permit issued
A legal certificate is issued by the government allowing occupancy of a structure to begin. -
official dedication
A ceremony or declaration for the opening of a structure is held by its owner, developer, or manager. -
usage begins
Operation begins in at least one of the assigned uses of a structure or other object. -
vacancy begins
Total vacancy begins when no tenant or regular user remains in use of a place, excluding routine temporary closures. -
vacancy ends
A place resumes regular use or receives new occupants after a significant period of vacancy or disuse. -
vacating begins
The first tenant moves out in a continuous and deliberate process of vacating an occupied area or structure.