Building is already topped out, construction of the west side of the facade begins
Connected to Afonso Bretas in Governador Valadares
1,000 × 1,450 px·0.69 MB·JPEG·316-004-591
- Format
- JPEG
- Dimensions
- 1,000 × 1,450 px
- File size
- 718,367 bytes
- Author line
- Virgilio Grimaldi
- Medium
- photograph
- Category
- construction
RatingJoin to rate