approved
Permission for construction has been granted by the government, and assembly of the structure is expected to begin in the future.
The approval stage covers the period after granting of permission by local authorities, up to the point when site clearance, excavation work, or other physical preparation for construction begins on the site.
Approval is conferred by whichever authority governs permission to build in the given location. Usually this refers to the city government or a particular department within that government. Permission is defined as the final significant contingency in the approval process, i.e. the last sanction whose passage entails any significant element of doubt. For example, in localities where the building permit itself is a mere formality after city council approval, the council's approval would demarcate the approval status rather than the building permit.
The approval boundary depends on the last permission involving significant uncertainty, rather than necessarily the document called a building permit. The stage continues until physical site preparation begins.
approved Photos
Related definitions
-
concept
Vague development plans have been announced, but no final design exists yet. -
proposed
Possibility of construction has been announced, and is awaiting approval by local authorities. -
site preparation
Clearance, excavation, or other preparation of a construction site before the first foundation element is installed.