facade re-used on same site
A new structure is completed on the same site, retaining the demolished structure's facade.
The facade of a structure is re-used on the same site when the facade or a major part of it is preserved after demolition, and when a new structure is completed on the same site, with that facade forming an integral part of it.
Usually when this occurs, the facade remains standing after demolition, supported by a temporary framework, and forms part or the whole of the new structure's facade. However in some cases the facade is dismantled and re-assembled in the same place. Also, there are a few cases where it winds up behind the facade of the new structure, usually visible behind glass or inside an interior space which engulfs the facade.
Completion of the replacement structure establishes the event. The facade can remain standing, be dismantled and reassembled, or be incorporated behind the new exterior, provided it forms an integral part on the same site.
Related definitions
-
condemnation
A government asserts its authority to take over a property or to demand its closing or demolition. -
controlled implosion
A structure is removed from its site or partly destroyed by a deliberate and sanctioned implosion or explosion. -
demolition approved
Government permission is granted for an actual plan to demolish a structure, rather than unrestricted permission alone. -
demolition begins
The first component is removed as part of a sanctioned process intended to dismantle a built object completely. -
demolition completed
Piece-by-piece demolition of a structure is completed with nothing left standing. -
demolition plans scrapped
A planned demolition is canceled before being carried out, leaving the object in existence. -
demolition proposed
A party with the legal right to do so first announces plans for a structure's destruction. -
demolition resumes
Systematic mechanical demolition starts again after an earlier demolition process was begun and halted. -
destroyed by damage
Damage completely destroys a structure, leaving it demolished rather than partly standing in ruins. -
destruction halted midway
Any kind of damage or demolition is halted with part of the structure still standing. -
facade re-used on other site
The facade of a demolished structure is moved to a new site and incorporated into another structure. -
replacement initiated
The identity of a structure on a site gives way to that of its replacement structure on the same site.